Author Archives: Web Master

Method Statement for Erection and Dismantling of Slab Formwork

General Requirements: Formwork shall be so constructed that it will support the loads imposed on it by fresh concrete together with additional stresses imposed by vibrating equipment and by construction traffic. For the construction of structural floor slabs formwork shall be used as per shop drawings and manufacturer’s recommendations. The PD 8 Shoring Tower &… Read More: Method Statement for Erection and Dismantling of Slab Formwork »

Method Statement For Installation Of Steel Structure For Attic Slab

Following equipment shall be arranged before starting the work. Lifting Equipment: Chain block / Lever Block is used to lifting the beams at the installation area. Usually use to help workers to lift the beams at low level height before fixing the connection bolts the same also for aligning the connection of the beams. Rotating & Power… Read More: Method Statement For Installation Of Steel Structure For Attic Slab »

Method Statement of Concreting for Vertical Elements Retaining Wall, Shear Walls & Columns

Below is a precise method statement for concrete works for vertical elements (Retaining Wall, Shear Walls, Columns etc.) Following equipment shall be arranged before starting the concrete pouring work: Survey Instruments Tower/Mobile Crane Mechanical Vibrators / Internal Vibrators Concrete Pumps Transit Mixer Trucks Batching Plant All necessary Hand Tools Safety Equipment’s Concreting Method For Vertical… Read More: Method Statement of Concreting for Vertical Elements Retaining Wall, Shear… »

Project Execution Plan – General Template

PURPOSE OF GENERIC PROJECT EXECUTION PLAN This document has been formulated to enable the compilation of a Project Execution Plan (PEP) for any type of construction project. This generic document has been formulated to cover all reasonable variables that would need to be considered. It has not been designed as a document that just requires… Read More: Project Execution Plan – General Template »

Construction Machinery Maintenance & Operation Procedure for Excavator

Below is best procedure for heavy equipment operation and maintenance that will provide safe operating instructions for excavator operators working on any kind of projects. Overall project manager and HSE team leader have responsibilities for the implementation of this standard safety procedure. All excavator operators must, hold a valid accredited 3rd party competence certificate and… Read More: Construction Machinery Maintenance & Operation Procedure for Excavator »

Gypsum Board Ceiling Method Statement

This method statement describes the method of installation of suspended gypsum board ceiling and tile ceiling in any kind of project or building. Project manager of the false ceiling subcontractor is overall responsible for the implementation of this method statement and ensure that the supervisory staff allocated for this work and all resources are in… Read More: Gypsum Board Ceiling Method Statement »