Wet Riser Piping and Landing Valve Installation Method Statement

This method statement is applicable for the installation of wet riser pipes, hose reels, related fittings and accessories. Following this standard procedure shall ensure that the firefighting pipe work and other related fittings and accessories are properly installed and conforms to the requirement of contract specifications, manufacturer instructions and NFPA 14 standard. Necessary Equipment /… Read More: Wet Riser Piping and Landing Valve Installation Method Statement »

General Questions & Answers Related to Construction Field

1. What is the difference between working stress approach and limit state approach? For working stress approach, service loads are used in the whole design and the strength of material is not utilized in the full extent. In this method of design, stresses acting on structural members are calculated based on elastic method and they… Read More: General Questions & Answers Related to Construction Field »

Hydrostatic Pressure Testing of Spherical Pressure Vessels – Method Statement

The purpose of this method statement is to make sure that hydrostatic pressure testing of spherical tanks is done safely as per client requirements, specifications and applicable local and international standards. Method statement is applicable for saturated and unsaturated LPG storage and intermediate tanks. Project manager has the overall responsibility for implementing and ensuring compliance… Read More: Hydrostatic Pressure Testing of Spherical Pressure Vessels – Method Statement »

method statement for drainage pipe installation

The purpose of this plumbing method statement is to define the task and introduce correct practices in order to ensure that the drainage piping job execution will meet the project requirements under the safe system of work. Procedure covers both metallic and non metallic drainage piping installations. Before starting the drainage installation work arrange necessary… Read More: method statement for drainage pipe installation »

Haul Truck / Dump Truck Safety, Loading and Dumping Procedure

The purpose of this construction safety procedure is to provide safe operating instructions for haul truck and dump truck operators working on any kind of projects including building and road construction machinery. This Instruction applies to projects and offices where a company operates and areas where haul trucks are in use. Project manager and project… Read More: Haul Truck / Dump Truck Safety, Loading and Dumping Procedure »

Method Statement For Temporary Sheet Piling / Shoring

Before starting the works following equipment shall be arranged. QUY80A Hydraulic Crawler Crane 80t – Lattice boom crawler crane with retractable tracks, suitable for work on a leveled platform. ICE815C Vibratory Hammer with power pack- 1 Nos. Procedure for Temporary Sheet Piling / Shoring The vibratory hammer is a purpose-built hydraulically driven hammer complete with… Read More: Method Statement For Temporary Sheet Piling / Shoring »