Author Archives: Web Master

Method Statement for HVAC Air Balancing and Air Flow Measurement

Table of Content 1. INTRODUCTION 2. PREREQUISITES TO PROCEDURE 2.1 Access / Egress 2.2 Responsibilities / Supervision 2.3 Requirements 2.4 Personal Protective Equipment 3. DESIGN PERAMETERS 3.1 Specification Reference 3.2 Drawing Reference 4. REFERENCE DOCUMENTS 4.1 Relevant Commissioning Codes 5. PRE-COMMISSIONING / PRE START CHECKS 5.1 Static Checks 6. COMMISSIONING / TEST PROCEDURES 6.1 Starting… Read More: Method Statement for HVAC Air Balancing and Air Flow Measurement »

Laying of Dense Bituminous Macadam DBM – Road Construction

This method statement covers the laying of Dense Bituminous Macadam (DBM) in 50 to 100 mm thick layers as profile correction course (PCC) on a previously prepared existing concrete surface as per specified lines & grades. The road construction works shall comply the contract agreement, project specifications, relevant drawings and applicable local and international standards.… Read More: Laying of Dense Bituminous Macadam DBM – Road Construction »

Fan Coil FCU Unit Installation Method Statement

Below is a precise method statement for fan coil unit FCU installation for any kind of project. Project manager is overall responsible for the implementation of this method and all applicable standards, specifications and manufacturer instructions for the FCU installation. Site engineer/ supervisor shall make sure that all necessary documentation work is approved, shop drawings/… Read More: Fan Coil FCU Unit Installation Method Statement »

Water Heater Installation | Geyser Installation Method Statement

This page gives a brief method statement for water heater installation or geyser installation in compliance with the approved design, drawings, approved material submittals and project specification. Prior to installation of Water Heater, the supervisor and foreman will verify and ensure that all the safety requirements have been complied and necessary control measures are in… Read More: Water Heater Installation | Geyser Installation Method Statement »

HVAC Ducting Outlets Grills and Diffusers Installation Method Statement

Below is a precise method statement that covers the installation of HVAC Ducting Outlets i.e. Grills and Diffusers. Scope of work includes all the ductwork for the project covering the outlets as per the approved schedule. Project manager is overall responsible for the control of all related activities including the quality of work and health… Read More: HVAC Ducting Outlets Grills and Diffusers Installation Method Statement »

Method Statement for 1” Fire Hose Reel System and 1 ½” Fire Hose System Installation

This method statement covers installation and inspection of 1” Fire Hose Reel System and 1 ½” Fire Hose System which is part of overall firefighting system. Purpose of this method of statement is to define the method of installation and inspection of Fire Fighting Hose Reel System. Quality of installation and materials at site will… Read More: Method Statement for 1” Fire Hose Reel System and 1… »