Batching Plant Best Practices for Batching of Concrete

The scope of this procedure covers best practices and checks for carrying out prior to and during the site batching of concrete. Checks prior to commencement of concrete batching activity: Basic constituents of concrete viz. cement, coarse and fine aggregates shall comply with the contract specifications. In case of large projects and where specified, a… Read More: Batching Plant Best Practices for Batching of Concrete »

Civil Method Statement for AAC Block Masonry Works

The purpose of this method of statement is to provide general instructions for AAC Block masonry works at a construction project site. This work procedure covers AAC masonry work to be executed in the substructures/super structures of different buildings as specified in the approved drawings. AAC Concrete blocks (light weight) shall generally conform to local… Read More: Civil Method Statement for AAC Block Masonry Works »

Heavy Duty Tyre Mounting Method

Below is a brief instruction that is applicable to all project sites where heavy-duty tyres are in use. Repairing and replacing heavy-duty wheel assemblies presents a safety hazard because of the size and varying types of rubber tyred equipment. This Instruction outlines the safe methods to be followed in mounting heavy-duty tyres and rims. Project… Read More: Heavy Duty Tyre Mounting Method »

Method Statement for Water Supply PPR & Pex Piping Installation

This document defines and covers the methods for installation of Water Supply Piping System at a construction project site, in compliance with the approved designs and approved material submittals. Prior to installation of PPR & PEX Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been… Read More: Method Statement for Water Supply PPR & Pex Piping Installation »

Roof Water Proofing Procedure Using Waterproof Membranes

The scope of this procedure comprises the control of waterproof membranes installation and application on flat and inclined substrates. The condition and moisture content of the substrate will be inspected and accepted by the subcontractor before commencement of waterproofing works on site. A meeting will be held with specialist subcontractor to discuss the scope, sequence… Read More: Roof Water Proofing Procedure Using Waterproof Membranes »

Project Environmental Safety Procedure – Job Safety and Environmental Analysis

The purpose of this EHS procedure is to provide a framework for reducing risks to employees and protect them from the work place hazards through the implementation of Job Safety and Environmental Analysis. Scope of work for this hse procedure  covers all construction project activities. Hazard is any condition or practice with the potential for… Read More: Project Environmental Safety Procedure – Job Safety and Environmental Analysis »