Mobile Plant and Machinery Safe Operation Method Statement at Construction Project

The purpose of this safe work method statement is to provide direction to the project management team on assessing, managing, controlling and the general use of plant and equipment, along with the operators, on site to ensure maximum safe guards are in

2026
Jan
10

Vertical Bracing Construction Method of Steel Buildings Structure

Vertical Bracing Construction Method of Steel Buildings Structure

Below is a precise method statement for erection and welding of vertical Bracing for steel buildings and structures as per the project requirements. Sequence of activities for Bracing Erection are as follows Receiving material from stores and temporarily stacking them if necessary

2025
Sep
8

Air Conditioning Installation of DX Split Units Including Refrigerant Piping & Brazing

air conditioning installation unit

This air conditioning method statement is developed for any kind of the project in order to achieve best quality of work at all levels for ac installation activity. Method Statement covers all the critical installation activities of air conditioning systems that includes

2025
Jul
23

Abrasive Wheels Risk Assessment & Control Measures

Abrasive Wheels Risk Assessment & Control Measures

This risk assessment is applicable for Chop Saws, Angle Grinders, Bench Grinders, cutting and grinding tasks in mechanical, fabrication and electrical disciplines. Hazards related to abrasive wheel include: Fire/explosion through ignition of sparks Bursting of abrasive wheel or disc at high speed Contact with wheel or