Project Management Procedure for Managing Provisional Sum and Nominated Subcontractors

1. Purpose The purpose of this contract commercial management procedure is to establish the correct administration for the process of Provisional Sums and Nominated Subcontractors for the project. 2. Scope This procedure is applicable for all projects. 3. References Subcontractor and Major

2019
Jul
15

Project Life Cycle HSE Management Activities – Civil Engineering & Infrastructure Work

This Method Statement describes the hse management arrangements and systems of work to be adopted by Company during civil engineering and Infrastructure groundwork operations. The document, with its appended risk assessment, will suffice for the majority of works undertaken by the company

2019
Jun
29

Reinforcing Bars Fabrication and Installation Method Statement

reinforcement bar method statement

1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0

2019
Mar
25

Method Statement Template for Construction of Temporary Causeway & Jetty

Table of Contents 1.0      Introduction 2.0      Purpose and Scope 3.0      Document Control 4.0      Reference Documents 5.0      Definitions, Terms and Abbreviations 6.0      Responsibility 7.0      Materials and Equipment 8.0      Resources 9.0      Methodology / Procedure 10.0    Permit 11.0    Quality Control 12.0    Health, Safety and Environment

2016
Apr
27

Project Flow Chart / Work Instruction Summary

Below is list of activities which are involved from beginning of a project i.e. from project tender stage up to handing over and final close out after the defect liability period. This can be helpful for new comers in construction industry to