Author Archives: Web Master

Sewer System Sewerage Piping Installation & Testing Method Statement

All the piping materials received at site will be inspected, upon receipt on the project site. Any discrepancies / damages should be notified and reported to the supplier for further action. Materials found not suitable for site use will be removed from site immediately. All construction/inspection/testing works shall be carried out in accordance with project… Read More: Sewer System Sewerage Piping Installation & Testing Method Statement »

Drainage Vacuum System Installation and Testing Method Statement

Before start of drainage system piping installation and testing completeness of the related works and systems shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records. Make sure that all tools/equipment/instruments required are calibrated and having valid certificate. Safe access to work areas shall be provided and shall be… Read More: Drainage Vacuum System Installation and Testing Method Statement »

Shear Wall Formwork Construction Method Statement

Below is a precise method statement that covers the formwork procedure for construction of shear walls. Kicker Form Assembly Procedure Upon completion of concreting of floor slab, all wall positions will be marked. Kicker forms are set according to the marked position of the wall. Kicker forms shall be secured to the floor slab properly.… Read More: Shear Wall Formwork Construction Method Statement »

Dewatering Method Statement

Below is a complete and precise dewatering method statement that covers the installation of the dewatering system as designed and detailed by temporary works designer/ consultant. Full time supervision shall be required to ensure the works are carried out in accordance to specifications, quality and approved drawings. Pumping Duration: Pumps shall be kept running to… Read More: Dewatering Method Statement »

Method of Statement for Structural Excavation and Backfilling

The purpose of this method statement is to define the standard work process for Structural Excavation and Backfilling related activities. Method of statement addresses work operation associated with structural excavation and backfilling. All necessary setting out, tree cutting, clearing and grubbing will be completed prior to performing this operation. This work consists of excavation for… Read More: Method of Statement for Structural Excavation and Backfilling »

Workplace Smoking Policy for Construction Company

It is the Company’s policy that all of its workplaces are smoke-free and that all employees have a right to work in a smoke-free environment and not be exposed to second-hand smoke. This is also a statutory requirement. As such, the Company’s business premises are no smoking premises and smoking is prohibited in all areas… Read More: Workplace Smoking Policy for Construction Company »