Category Archives: Construction Method Statement

Method Statement for Water Supply PPR & Pex Piping Installation

This document defines and covers the methods for installation of Water Supply Piping System at a construction project site, in compliance with the approved designs and approved material submittals. Prior to installation of PPR & PEX Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been… Read More: Method Statement for Water Supply PPR & Pex Piping Installation »

Roof Water Proofing Procedure Using Waterproof Membranes

The scope of this procedure comprises the control of waterproof membranes installation and application on flat and inclined substrates. The condition and moisture content of the substrate will be inspected and accepted by the subcontractor before commencement of waterproofing works on site. A meeting will be held with specialist subcontractor to discuss the scope, sequence… Read More: Roof Water Proofing Procedure Using Waterproof Membranes »

Street Light Pole Foundation Construction Method Statement

The purpose of this method statement is to describe the procedure and activities involved in the construction of Street light pole foundations in the project complying all contract requirements. All quality control procedures to be implemented in systematic way, works shall be inspected, conformance verified and documented. Applicable health and safety precautions are implemented throughout… Read More: Street Light Pole Foundation Construction Method Statement »

Scaffolding Shuttering Formwork Erection, Removal and Dismantling Method Statement

This document summarizes the general details for any kind of scaffolding formwork system as well as traditional wooden forms including Fabrication, Erection, Removal, Inspection and Striking etc. The sequence of activities includes: Tying up reinforcement Concreting Curing De-shuttering Cleaning Stacking This scope of works is for the following reinforced concrete works: Horizontal Elements: slabs, beams,… Read More: Scaffolding Shuttering Formwork Erection, Removal and Dismantling Method Statement »