Testing & Commissioning Method Statement for Footfall Visitor Counting System

The user acceptance tests will demonstrate that the system and related materials have been correctly installed and that the footfall system will operate in a manner that will enable client to accept it as a working system and proceed with the process of using it. Purpose of the User Acceptance Tests (UAT) in this document… Read More: Testing & Commissioning Method Statement for Footfall Visitor Counting System »

Safe Evacuation Procedure in Electrical Emergency Situation

This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital that the work should be planned in detail and risk assessments/ JSEA’s made… Read More: Safe Evacuation Procedure in Electrical Emergency Situation »

Surge & Lightning Protection Earthing Grounding System Installation

The aim of this method statement is to describe electrical works associated with installation of earthing / grounding system, lightning surge protection systems. The grounding & lightning protection system are designed to ensure the complete safety of both persons and equipment throughout the project buildings and facilities. Storage of exothermic welding materials should be in… Read More: Surge & Lightning Protection Earthing Grounding System Installation »

Method Statement for Cable Laying and Termination for Control and Signal Cables

The purpose of this method statement is to provide general guidelines for cable laying and cable termination for control and signal cables. Scope of this method statement covers the followings activities. material handling procedure precaution testing inspection The following documents are considered as reference documents: project standard installation drawings project specifications project quality plan (pqp)… Read More: Method Statement for Cable Laying and Termination for Control and… »

Structured Cable Installation Method Statement

Below is an electrical method statement for the installation of structured cable / network cabling system (IPTV, MC, CCTV & ACCESS CONTROL) as per the project specifications and manufacturer installation instructions. System is also known as it structured cabling. Arrange below tools and tackles: Electrician toolbox Hand Tools such as Crimping Tools, Cable cutters etc.… Read More: Structured Cable Installation Method Statement »

Electrical Switchgear Installation Method Statement for 11KV HV Panel

Below is a precise method of statement for electrical works, that explains and covers the installation & inspection of 11KV switchgear panels on already approved and ready base/plinth. Switchgear installation shall be done in compliance with the project electrical specifications and switchgear manufacturer instructions. Other documents, codes and references are given below that must be… Read More: Electrical Switchgear Installation Method Statement for 11KV HV Panel »