Category Archives: EHS Environmental Health and Safety

Construction Project Site Clearance Method

The purpose of this method is to give guidance for the clearing operation for all site areas where clearing is required. Instruction applies to all areas and is not limited to clearing for dump areas, haul roads and pits. This safework instruction takes into account all aspects of this activity including operation, production, safety, environment… Read More: Construction Project Site Clearance Method »

Demolition Method Statement for Covered Walkway

Below is a brief method statement that is for the demolition of existing covered walkway. Existing structure shall be removed completely, which is a cantilevered structure supported by steel elements and covered with roof tiles. Below is list of equipment for demolition works: Skip Tank Oxygen Acetylene cutting torch Electric Concrete breaker Mini- excavator Preparatory… Read More: Demolition Method Statement for Covered Walkway »

Heavy Duty Tyre Mounting Method

Below is a brief instruction that is applicable to all project sites where heavy-duty tyres are in use. Repairing and replacing heavy-duty wheel assemblies presents a safety hazard because of the size and varying types of rubber tyred equipment. This Instruction outlines the safe methods to be followed in mounting heavy-duty tyres and rims. Project… Read More: Heavy Duty Tyre Mounting Method »

Project Environmental Safety Procedure – Job Safety and Environmental Analysis

The purpose of this EHS procedure is to provide a framework for reducing risks to employees and protect them from the work place hazards through the implementation of Job Safety and Environmental Analysis. Scope of work for this hse procedure  covers all construction project activities. Hazard is any condition or practice with the potential for… Read More: Project Environmental Safety Procedure – Job Safety and Environmental Analysis »