Category Archives: Electrical Method Statements

An electrical method statement is the step by step guide for performing the electrical construction works for any project. The method statement for electrical work is very important document to perform the work right first time.

Electrical Power Busbar System Installation Method Statement

This procedure defines the methods to be adopted for the installation of Busbar System. Document ensures that the electrical installation works at site are in compliance with the approved shop drawing and approved material submittal. Scope of this method statement is procedure for Material Delivery Inspection, storage and Installation of Busbar system. During the receiving… Read More: Electrical Power Busbar System Installation Method Statement »

Electrical Installation Method Statement for HV Panels

All workers to attend safety induction conducted by main contractor and specific training on the safe installation methods. Install HV Panels as indicated on the approved shop drawing and as per specification and according to manufacturer’s recommendation. Site Engineer and Site Supervisor will give necessary instructions to tradesmen (electrical technician) and provide necessary approved construction/shop… Read More: Electrical Installation Method Statement for HV Panels »

Central Battery & Emergency Lighting System Installation Method Statement

The following procedure will be followed for installation of Central Battery system and can be customized as per the specific needs for different projects. Emergency lighting battery system shall be of modular construction with all modules being plug in type encapsulated design. The outgoing circuits shall be fed through changeover modules. Each module shall be capable… Read More: Central Battery & Emergency Lighting System Installation Method Statement »

Method Statement for Underground Cable Laying

This electrical safework method statement describes the management arrangements and system of work to adopted for the laying cable for the electrical project. Below is necessary tools & equipment for performing the site activities for laying the cable. Cable Rollers Cable Pulling Grip Hand Cable cutter Manual Cable Crimpers Hydraulic Pole Saws Hand shovel Pickaxe… Read More: Method Statement for Underground Cable Laying »