Category Archives: HVAC Method Statement

Method Statement for Air Conditioner Equipment (FCU, AHU, FAHU & Fans) Installation

Below is a precise method statement that describes the steps for the installation of air conditioner equipment in a central AC system like exhaust fans, AHU, FCU and FAHU etc. HVAC equipment installation involves working on height that requires strict health and safety measures, which are briefly explained in below section. Modular Supervisors and foremen… Read More: Method Statement for Air Conditioner Equipment (FCU, AHU, FAHU &… »

HVAC Air Distribution System Duct Work Installation Insulation and Cladding Method of Statement

Purpose of this mechanical procedure is to define the sequence and methodology for all critical installation activity pertaining to HVAC air distribution system i.e. ductworks for any kind of construction project building with contract scope of work, applicable standards and drawings. The scope of work includes AC units with chilled water piping connected with ductworks,… Read More: HVAC Air Distribution System Duct Work Installation Insulation and Cladding… »

Air Handling Unit AHU Installation Method of Statement

Below is a brief HVAC method statement that covers the installation of Air Handling Units on a construction project. Procedure defines the method used to ensure the AHU installation has been carried out as per contract specifications and manufacturer’s recommendations. Method statement gives details of how the work will be carried out and how the… Read More: Air Handling Unit AHU Installation Method of Statement »

Welding Method Statement & Requirements for Carbon Steel Piping

All welding shall be generally in accordance with BS 4515 (Specification for field welding of Carbon steel pipelines.). The method may be modified where appropriate for other materials and may be relaxed or varied by order of the consulting engineer, provided that the Contractor has made a reasonably comprehensive request for an alternate. Tack welds… Read More: Welding Method Statement & Requirements for Carbon Steel Piping »

Chilled Water Pipe Installation & Testing Method of Statement

Below is a brief mechanical HVAC method statement that covers the installation of chilled water CHW piping system. This procedure defines the method used to ensure that the piping installation has been carried out as per contract requirements and best practices. Also it gives details of how the work will be carried out and how… Read More: Chilled Water Pipe Installation & Testing Method of Statement »

Valves Installation Method Statement

Below is precise plumbing method statement that shall ensure that the plumbing accessories i.e. valves installation is done as per contract requirements and manufacturer instructions. The method also gives details of how the work will be carried out and the health and safety issues and controls shall be implemented. Materials, equipment and components when arriving… Read More: Valves Installation Method Statement »