Air Handling Unit AHU Installation Method of Statement

Below is a brief HVAC method statement that covers the installation of Air Handling Units on a construction project. Procedure defines the method used to ensure the AHU installation has been carried out as per contract specifications and manufacturer’s recommendations. Method statement gives details of how the work will be carried out and how the… Read More: Air Handling Unit AHU Installation Method of Statement »

Welding Method Statement & Requirements for Carbon Steel Piping

All welding shall be generally in accordance with BS 4515 (Specification for field welding of Carbon steel pipelines.). The method may be modified where appropriate for other materials and may be relaxed or varied by order of the consulting engineer, provided that the Contractor has made a reasonably comprehensive request for an alternate. Tack welds… Read More: Welding Method Statement & Requirements for Carbon Steel Piping »

Chilled Water Pipe Installation & Testing Method of Statement

Below is a brief mechanical HVAC method statement that covers the installation of chilled water CHW piping system. This procedure defines the method used to ensure that the piping installation has been carried out as per contract requirements and best practices. Also it gives details of how the work will be carried out and how… Read More: Chilled Water Pipe Installation & Testing Method of Statement »

Construction Methodology for Building Construction Project Civil Work

The purpose of this construction methodology is to specify the requirements of civil building construction activities including excavation, backfilling, and allied activities complying with the contract documents, project specifications as per the scope of work and approved drawings/documents. This method statement also covers requirements for earthworks associated with trenches for pipelines or service ducts etc.… Read More: Construction Methodology for Building Construction Project Civil Work »

Valves Installation Method Statement

Below is precise plumbing method statement that shall ensure that the plumbing accessories i.e. valves installation is done as per contract requirements and manufacturer instructions. The method also gives details of how the work will be carried out and the health and safety issues and controls shall be implemented. Materials, equipment and components when arriving… Read More: Valves Installation Method Statement »

Fire Sprinkler System Installation Method Statement

This mechanical method statement covers the installation of fire sprinkler system piping network. Procedure defines the method used to ensure the installation has been carried out as per contract requirements and best industry practices. The method statement gives details of how the work will be carried out and how the health and safety issues and… Read More: Fire Sprinkler System Installation Method Statement »