AC Installation Method Statement for Split Unit / Mini Split

Below is a brief HVAC method statement that covers the Installation air conditioning split unit. By following this procedure installer will ensure that the installation has been carried out as per contract specifications and manufacturer’s recommendations. The method statement gives details of how the ac installation work will be carried out and the how the… Read More: AC Installation Method Statement for Split Unit / Mini Split »

Foundation Construction Civil Method Statement

The purpose of this general method statement is to describe the construction procedures for the isolated pile cap and pad foundations. Large raft foundations will be covered in specific foundation method statements and are not included in this document. The works will incorporate the procedures necessary to execute the following items:­ Preparing of Work Survey… Read More: Foundation Construction Civil Method Statement »

Corporate Commercial Project Review Procedure

Purpose: To provide a system for a review of projects by impartial, independent and experienced personnel to ensure that required performance standards are being met and to assist and advise the related parties as appropriate. Scope: This procedure is applicable for all construction projects of a company. The scope shall include, but not be limited to, the… Read More: Corporate Commercial Project Review Procedure »

Project Management Procedure for Contract Review

1. Purpose The purpose of this procedure is to ensure that prior to submitting a Tender the proposed terms and conditions are appropriately reviewed in order to: – gain an overall appreciation of the risk profile of the proposed contract – identify any specific provisions which may be unacceptable to company and that will require… Read More: Project Management Procedure for Contract Review »

Ready Mix Concrete Work Method Statement Including Formwork and Reinforcement Bars

This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the concrete works: Batching Plants Mobile Concrete Pumps Truck-mixers Air Compressor Mobile Water Tank Diesel Generator Risk Assessments Risk: Falling from height Action: Personnel to be 100% tied-off when working… Read More: Ready Mix Concrete Work Method Statement Including Formwork and Reinforcement… »

Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement

This method statement represents the proposed construction procedure for the bituminous roads, kerbs, tiles and paver block installation activities. It is the overall responsibility of the project manager for road work, to ensure that the site preparation activities and safety requirements are conducted according to the project specifications and approved project safety plan. The method… Read More: Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement »