Category Archives: Construction Method Statement

Air Cooled Condenser Erection and Assembly Method Statement

This document describes the methods proposed to be used for the erection operations related to the air cooled condenser for any kind of plant project. Method statement identifies the general steps, arrangements and precautions for the assembly and erection works of ACC. This method statement also defines piping erection of all control equipment at the… Read More: Air Cooled Condenser Erection and Assembly Method Statement »

Rock Blasting Method Statement

This method statement provides the details of the materials, the equipment, the procedure and relevant documents related to the Rock Blasting activity, including the quality control verifications, the measurement verifications, and also the safety precautions to be implemented for this work. Location of Works The location of the rock blasting works will be limited to… Read More: Rock Blasting Method Statement »

RCC Work Building Construction Method Statement

Below is a precise RCC work building construction method statement that covers Casting of Foundation, Neck column, Tie beam, Grade Slab, Columns, Core & shear walls, Beams & Suspended Slab according to specified drawings and quality standards. The contractor’s approved shop drawing for RCC structural elements shall be available for inspection by the consultant engineer.… Read More: RCC Work Building Construction Method Statement »

Introduction to Excavation and Use of Heavy Equipment for Basement Construction

In general, excavation means to loosen and take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used which include backfilling with new or original materials to voids, spreading and levelling over an area. British Standard CP6031 gives standards and recommendation to earthworks covering embarkment and cuttings, levelling and… Read More: Introduction to Excavation and Use of Heavy Equipment for Basement… »

Copper Pipe Installation Method of Statement for Water Supply

Below plumbing method statement describes the procedure for the installation of copper pipe for domestic water services (hot & cold) inside buildings for any kind of the building construction project. Overall project manager is responsible for the implementation of this copper pipe installation method statement. By following this MOS project team will ensure that plumbing installation… Read More: Copper Pipe Installation Method of Statement for Water Supply »

method statement for drainage pipe installation

The purpose of this plumbing method statement is to define the task and introduce correct practices in order to ensure that the drainage piping job execution will meet the project requirements under the safe system of work. Procedure covers both metallic and non metallic drainage piping installations. Before starting the drainage installation work arrange necessary… Read More: method statement for drainage pipe installation »