Slips, Trips and Falls Risk Assessment

This risk assessment is applicable for all kind of operations including the use of tools and equipment’s. Scope of the document is all  locations including sites, offices, stores, workshops, canteens, dry rooms, toilets etc. For all type of  work activities at the same level within the working environment including platforms. Hazards include: Cuts and Abrasions Laceration Serious bodily… Read More: Slips, Trips and Falls Risk Assessment »

Electrical Installation Method Statement for HV Panels

All workers to attend safety induction conducted by main contractor and specific training on the safe installation methods. Install HV Panels as indicated on the approved shop drawing and as per specification and according to manufacturer’s recommendation. Site Engineer and Site Supervisor will give necessary instructions to tradesmen (electrical technician) and provide necessary approved construction/shop… Read More: Electrical Installation Method Statement for HV Panels »

Method of Statement for Installation of Natural Gas System, Pipe Work, Distribution Lines and Branches

This method of statement is applicable for the installation of Natural Gas System, pipe work, distribution lines, gas branches inside the retails of the Building (regulators, gas meters, valves, etc.) for the building project. Project manager will have the overall responsibility of the Project for execution, quality and safety. Also he will maintain the planning… Read More: Method of Statement for Installation of Natural Gas System, Pipe… »

HSE Procedure for Setting Site Compound, Parking and Material Storage

This method statement outlines the procedure and methodology for the site compound set up, including Parking and Material Storage. Typically contracts manager, site agent, foreman and a suitably qualified ecologist is responsible for this activity. Other employees who are directly involved include plant operators, banksman, site supervisor and general operatives. Necessary Plant & Equipment 20… Read More: HSE Procedure for Setting Site Compound, Parking and Material Storage »

Project Landscaping Automatic Irrigation Works Method Statement

The objectives of this method statement is to briefly describe the major activities and set inspection milestones for irrigation system installation. Purpose of this procedure is to establish general guidelines addressing major requirements that are necessary to ensure that irrigation work conforms to the project drawings, design and specifications. This method statement explains and covers… Read More: Project Landscaping Automatic Irrigation Works Method Statement »

Project Progress Reporting & Monitoring Procedure

This project management procedure describes the activities related to project progress report and progress control methods and Reports to enable effective monitoring of a project. Progress Measurement Procedure Progress measurements shall be undertaken on a regular basis of all works in progress. The period of measurement will be determined by the Project Director / Project… Read More: Project Progress Reporting & Monitoring Procedure »