Road Maintenance Method Statement Including Cracks Potholes Patches Edge Breaks

Contractor will carry out the road maintenance and construction works in compliance with the technical specification and engineer’s instructions. With the direction and instruction of the client/ consulting engineer, at the designated areas, the motor graders and excavators are used to clear, remove, and dispose all vegetation, silt and grubbing roots, down timber and other… Read More: Road Maintenance Method Statement Including Cracks Potholes Patches Edge Breaks »

Plastering Method Statement

This procedure covers the methodology to be followed for carrying out plastering in line with the approved technical project specifications. Project site manager will provide inputs as per the project execution plan to ensure that lifting strategies & philosophy are addressed, and is responsible for the overall management of the project construction team to ensure… Read More: Plastering Method Statement »

Method Statement for Plastering Works

Below is a standard method statement for plastering works, which must be followed for any kind of project. Any suitable location can be designated by the client/consultant for the construction of Mock Up, prior to start the actual work in order to obtain final approval. Approved mock-up may remain as part of the completed works.… Read More: Method Statement for Plastering Works »

Method Statement for Tiling Work Installation of Ceramic, Porcelain & Agglomerate Tiles

Below is step wise civil work method statement for tile fixing and installation of ceramic, porcelain & agglomerate tiling works for any kind of building projects. Following is list of necessary equipment’s and tools that are mandatory for the tiling work: Drum mixer Grinder/saw or wet diamond table masonry cutter Aluminum straight edge Trowel Plumb… Read More: Method Statement for Tiling Work Installation of Ceramic, Porcelain &… »

Method Statement for Screeds/Topping Operation Above Water Proofing in Toilet, Roof Slab and Raft Slab

The purpose of this procedure is to define how screeds/toppings shall be carried out under controlled condition. This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. Method statement also covers the Screeding operation below tiling works in concrete slabs wherever necessary. This… Read More: Method Statement for Screeds/Topping Operation Above Water Proofing in Toilet,… »

Natural Gas Piping Installation Method Statement

This procedure is applicable to all natural gas pipeline underground installation works at any kind of project and aims to ensure that all works are carried out to comply with the applicable acts, regulations and by laws i.e. Local and international code of Practice for the Installation of Fuel Gas Piping Systems and Appliances, Occupational… Read More: Natural Gas Piping Installation Method Statement »