As Built Drawing and Documentation Project Management Procedure
This as built procedure describes the requirements for preparation of as built drawing and other project as build documentation. The purpose of this procedure is to ensure that variations from the original dimensions, design intent or materials shown on the drawings, specifications, or other documents are appropriately recorded for the purpose of producing accurate as… Read More: As Built Drawing and Documentation Project Management Procedure »
