Wave Propagation Pile Testing Types and Methods
In the 1950’s, E.A. Smith of the Raymond Pile Driving Company studied wave propagation on slender rods, and developed a numerical analysis method to predict the capacity versus blow count relationship and investigate pile driving stresses. The model mathematically represents the hammer and all its accessories (ram, cap, cap block), as well as the pile,… Read More: Wave Propagation Pile Testing Types and Methods »
