Introduction to Excavation and Use of Heavy Equipment for Basement Construction

In general, excavation means to loosen and take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used which include backfilling with new or original materials to voids, spreading and levelling over an area. British Standard CP6031 gives standards and recommendation to earthworks covering embarkment and cuttings, levelling and… Read More: Introduction to Excavation and Use of Heavy Equipment for Basement… »

Dewatering Method Statement

Below is a complete and precise dewatering method statement that covers the installation of the dewatering system as designed and detailed by temporary works designer/ consultant. Full time supervision shall be required to ensure the works are carried out in accordance to specifications, quality and approved drawings. Pumping Duration: Pumps shall be kept running to… Read More: Dewatering Method Statement »