Below method statement covers the above ground drainage installation activities. By following this procedure contractor shall ensure that the installation of drainage piping has been carried out as per project contract requirements, specifications and best practices. It gives details of how the
Read More
The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications 0considering safety and
Read More
This Method Statement covers the installation of uPVC and HDPE pipes for use with the underground and substructure drainage piping systems. Procedure defines the method used to ensure the underground drainage pipework installation has been carried out as per technical specifications and
Read More