Method Statement for Repair of Concrete with Fosrocs Rendroc Materials
This concrete repairing method statement details the procedure for repairing the concrete works according to type of defects observed, in accordance with the manufacturer’s requirements. The works shall be performed as mentioned in this procedure and the quality assurance requirements shall be consistent with the relevant sections of Quality Management System Manual of the contractor… Read More: Method Statement for Repair of Concrete with Fosrocs Rendroc Materials »
