Earned Value Management – EVM Analysis During Design

Earned Value Management (EVM) is a project management technique for measuring project performance and progress in an objective manner. EVM has the ability to combine measurements of scope, schedule, and cost in a single integrated system. Earned Value Management is notable for its ability to provide accurate forecasts of project performance problems. Early EVM research… Read More: Earned Value Management – EVM Analysis During Design »

RCC Work Building Construction Method Statement

Below is a precise RCC work building construction method statement that covers Casting of Foundation, Neck column, Tie beam, Grade Slab, Columns, Core & shear walls, Beams & Suspended Slab according to specified drawings and quality standards. The contractor’s approved shop drawing for RCC structural elements shall be available for inspection by the consultant engineer.… Read More: RCC Work Building Construction Method Statement »

Introduction to Excavation and Use of Heavy Equipment for Basement Construction

In general, excavation means to loosen and take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used which include backfilling with new or original materials to voids, spreading and levelling over an area. British Standard CP6031 gives standards and recommendation to earthworks covering embarkment and cuttings, levelling and… Read More: Introduction to Excavation and Use of Heavy Equipment for Basement… »

Method Statement For Fixing & Installation Of Stone Flooring Marble / Granite Works

This method statement provides the control sequence and installation methodology that will be used for supply, laying and fixing or installation of Stone Flooring (Marble/Granite Flooring), Finishes shown on the approved Shop Drawings or finishing schedules in compliance with the Project Specification. The following equipment and tools shall be provided with the necessary numbers to… Read More: Method Statement For Fixing & Installation Of Stone Flooring Marble… »

Project Management Monthly Reporting Procedure & Formats

1. Purpose The purpose of this procedure is to provide a standard monthly project report formats and guidelines, which facilitate the accurate and regular reporting of a project’s progress and status to senior management. The contents of the Monthly Project Report represent the minimum reporting requirements. 2. Scope This procedure is applicable for all projects… Read More: Project Management Monthly Reporting Procedure & Formats »

Method Statement For Erection and Dismantling Of Slab Formwork For Water Tanks

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the construction work in compliance to standard and good practice at all stages and activities for the Erection & Dismantling of the Slab Formwork for Water Tanks. Following equipment’s and tools will be used as required during the… Read More: Method Statement For Erection and Dismantling Of Slab Formwork For… »