Category Archives: Electrical Method Statements

An electrical method statement is the step by step guide for performing the electrical construction works for any project. The method statement for electrical work is very important document to perform the work right first time.

Telephone System Installation Method Statement

The purpose of this method statement is to implement the correct practices for installation of telephone system on a project. By following the guide line contained herein the contractor shall ensure that the telephone system installation works comply with the project requirements and serves the intended function as per the client satisfaction. Telephone system accessories… Read More: Telephone System Installation Method Statement »

Electrical Transformer Installation Method Statement

This method statement explains and covers the installation & inspection of cast resin Transformers but can be useful for other types of transformers. The electrical standard procedure can be used for any kind of construction project covering the electrical scope of work. Overall project manager is responsible for implementation of method statement and relevant forms… Read More: Electrical Transformer Installation Method Statement »

PVC & GI Electrical Conduit Installation Method Statement

This method of statement covers the installation of conduits for: Cast in situ, Concealed on Block Walls, Surface mounted and Underground Installations The purpose of generating this electrical method statement is to define the step by step guide for installation of PVC and GI conduits. By following the guidelines contained herein installation contractor shall ensure… Read More: PVC & GI Electrical Conduit Installation Method Statement »

METHOD STATEMENT FOR INSTALLATION OF LV SWITCHBOARDS, MCCs, CAPACITOR BANKS, VFDs, SMDBs AND DISTRIBUTION BOARDS

The purpose of this Method Statement is to establish a systematic procedure for the safe handling, installation, inspection, testing, and commissioning of Low Voltage (LV) Switchboards, Motor Control Centers (MCCs), Capacitor Banks, Variable Frequency Drives (VFDs), Sub Main Distribution Boards (SMDBs), and Distribution Boards (DBs). This document ensures that all installation activities are executed in… Read More: METHOD STATEMENT FOR INSTALLATION OF LV SWITCHBOARDS, MCCs, CAPACITOR BANKS,… »

Lighting Control System Installation Method Statement

Below method statement defines step by step procedure for lighting control system installation. By following this electrical methodology the installer shall make sure that the installation job execution complies with the project requirements and serves the intended function to the satisfaction of the client/consultant. This method statement refers to various work procedures contained within project… Read More: Lighting Control System Installation Method Statement »

High Voltage Underground Cable Installation

Below is a precise electrical method statement that explains step by step procedure high voltage underground cable installation. By following this cable laying procedure installer shall ensure that the job execution complies with the project requirements and serves the intended function to satisfaction of the client. Overall project manager is responsible for implementation of this… Read More: High Voltage Underground Cable Installation »