Following tools or equipment shall be arranged before starting the work. Crane – 200 to 300T : 1 No. Tower cranes at site Flat bed trailer : 1 No. Scaffolding (with green tag) Gas Cutting sets : 2 Nos. Welding set :
Read More
All painting works shall be carried out strictly in accordance with approved paint manufacturer’s recommendations and relevant applicable standards. Application of Painting system to the internal/external surfaces shall be as approved by the CONSULTANT and as required in compliance with manufacturer’s recommendations,
Read More
Lifting Equipment: Chain block / Lever Block used to lifting the beams at the installation area. Usually use to help workers to lift the beams at low level height before fixing the connection bolts the same also for aligning the connection of the
Read More
Before starting the works following equipment shall be arranged. QUY80A Hydraulic Crawler Crane 80t – Lattice boom crawler crane with retractable tracks, suitable for work on a leveled platform. ICE815C Vibratory Hammer with power pack- 1 Nos. Method Statement For Temporary Sheet
Read More
Activity: Use of electrical equipment’s Hazards & Risks: Electrical Shock, Cables management issues, Personal Injury Control Measures: – Fire exit routes / Muster points shall be properly indicated by installation of signs. – Working areas shall be barricaded (only authorized personnel are
Read More
Were the project objectives (expected outcomes) Accomplished? Explanation if required Were all Deliverable submitted and accepted? Explanation if required Did the Client/Engineer verify that all deliverable met the requirements? Explanation if required Have all subcontracts been closed? Explanation if required Have all final payments been made? (i.e., invoices
Read More