2017
Mar
15

Requirements for Road Marking Paint For Pavements centreline, edge lines, cross walks etc.

Permanent Markings for Concrete Surfaces Two part epoxide resin paint shall be used for marking concrete surfaces. The paint shall give a matt or semi-gloss finish and is to be formulated on a catalyst cured epoxide resin base. The material should be

error: Content is protected !!