Below is a standard method statement for plastering works, which must be followed for any kind of project. Any suitable location can be designated by the client/consultant for the construction of Mock Up, prior to start the actual work in order to
Read More
1. Purpose 2. Scope 3. Definitions 4. Responsibilities 5. Safety 5.1 Machinery and Equipment 5.2 Personal Protective Equipment 5.3 Safety Arrangement during the foundation work 6. Working Method 6.1 Preparing Work 6.2 Survey and Setting out 6.3 Excavation 6.4
Read More
This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the work: Batching Plants 1-2 Mobile Concrete Pumps 1-4 Truck-mixers 1-8 Air Compressor 1-3 Mobile Water Tank