2024
					Jul
					
					
					
					
					
					12
				Woven Vinyl Flooring Installation Method Statement
 
		
					Woven Vinyl Flooring installation works shall be completed as per details, pattern & design shown on the approved shop drawings and manufacturer’s recommendations. Visual appearance shall be consistence throughout and the vinyl flooring material shall be free from all defects like discoloration