2021
Dec
4
Construction Definitions & Terms – Beginning with A and B
A/C– An abbreviation for air conditioner or air conditioning. A/C Condenser– The outside fan unit of the Air Conditioning system. It removes the heat from the Freon gas and “turns” the gas back into a liquid and pumps the liquid back to