2025
Jan
25
General Requirements for Dewatering – Excavations and Pits

This document specification deals with the general requirements for the Dewatering to keep excavations and pits dry, and to prevent damage to the buildings due to hydrostatic pressure. Work of this section shall be considered as Specialist Work and to be conducted