2023
Apr
24
Method Statement for Screeds/Topping Operation Above Water Proofing in Toilet, Roof Slab and Raft Slab

The purpose of this procedure is to define how screeds/toppings shall be carried out under controlled condition. This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. Method statement