2026
Feb
3

Sub Surface Geotechnical Investigation Requirements for Structures/Bridge Foundations

Sub Surface Geotechnical Investigation Requirements for Structures/Bridge Foundations

For the design of bridges foundation, the scope of subsurface exploration shall be to determine soil parameters and rock characteristics and their suitability by insitu testing or testing of samples/cores taken out of exploration. It shall be planned in such a way

error: Content is protected !!