2019
Jun
29
Reinforcing Bars Fabrication and Installation Method Statement
![reinforcement bar method statement](https://projectmanagement123.com/wp-content/uploads/2016/01/concrete-superstructure-method-statement-100x65.jpg)
1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0