Culvert Pipe Installation Method Statement

Below is a detailed procedure for construction of pipe culverts for any kind of road or pavement project. Detailed working drawing will be prepared & submitted for approval for each and every culvert pipe works. After the site has been surveyed, the limits of excavation shall be set out to true lines, curves and slope… Read More: Culvert Pipe Installation Method Statement »

Foundation Construction Civil Method Statement

The purpose of this general method statement is to describe the construction procedures for the isolated pile cap and pad foundations. Large raft foundations will be covered in specific foundation method statements and are not included in this document. The works will incorporate the procedures necessary to execute the following items:­ Preparing of Work Survey… Read More: Foundation Construction Civil Method Statement »

Ready Mix Concrete Work Method Statement Including Formwork and Reinforcement Bars

This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the concrete works: Batching Plants Mobile Concrete Pumps Truck-mixers Air Compressor Mobile Water Tank Diesel Generator Risk Assessments Risk: Falling from height Action: Personnel to be 100% tied-off when working… Read More: Ready Mix Concrete Work Method Statement Including Formwork and Reinforcement… »

Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement

This method statement represents the proposed construction procedure for the bituminous roads, kerbs, tiles and paver block installation activities. It is the overall responsibility of the project manager for road work, to ensure that the site preparation activities and safety requirements are conducted according to the project specifications and approved project safety plan. The method… Read More: Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement »

Construction of Concrete Plinths for Blowers, Backwash Pumps and Transfer Pumps

This method statement provide details and procedures which will and is to be followed for the successful construction of concrete plinths for the Blowers, Backwash Pumps and Transfer Pumps in the Machine Room. The Supervision of the installation will be done by the Site Manager and Inspection by the Quality Inspector. The Labor for the… Read More: Construction of Concrete Plinths for Blowers, Backwash Pumps and Transfer… »

Method Statement for Piling Works at Construction Project

The purpose of this civil work method statement is to define the procedure for piling construction works at a project in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. The scope of work may include piling construction works at the existing ground level,… Read More: Method Statement for Piling Works at Construction Project »