2019
Jun
29

Reinforcing Bars Fabrication and Installation Method Statement

reinforcement bar method statement

1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0

2019
Mar
25

Method Statement Template for Construction of Temporary Causeway & Jetty

Table of Contents 1.0      Introduction 2.0      Purpose and Scope 3.0      Document Control 4.0      Reference Documents 5.0      Definitions, Terms and Abbreviations 6.0      Responsibility 7.0      Materials and Equipment 8.0      Resources 9.0      Methodology / Procedure 10.0    Permit 11.0    Quality Control 12.0    Health, Safety and Environment

2016
May
21

Method Statement For Fixing & Installation Of Stone Flooring Marble / Granite Works

This method statement provides the control sequence and installation methodology that will be used for supply, laying and fixing or installation of Stone Flooring (Marble/Granite Flooring), Finishes shown on the approved Shop Drawings or finishing schedules in compliance with the Project Specification.

error: Content is protected !!