Category Archives: Civil Method Statements

Method Statement For Erection and Dismantling Of Slab Formwork For Water Tanks

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the construction work in compliance to standard and good practice at all stages and activities for the Erection & Dismantling of the Slab Formwork for Water Tanks. Following equipment’s and tools will be used as required during the… Read More: Method Statement For Erection and Dismantling Of Slab Formwork For… »

Road Marking Method Statement

The purpose of this roadwork method statement is to ensure that all road marking and signs are executed safely and in accordance with the contract requirements and that all quality assurance and quality control activities are conducted in a systematic manner, also the road work are inspected and conformance to project specifications and applicable codes… Read More: Road Marking Method Statement »

Method Statement for Installation, Testing & Commissioning of Monospace Elevator

Below is a detailed method statement that covers installation, Testing & Commissioning of Monospace Elevator for any kind of construction project. REQUIRED INSTALLATION TOOLS: Installation power hoist – TIRAK X series 750 kg capacity with pulleys Manual chain pulley block Over Speed Governor Hanger positioning rod Safety pedal for Over Speed Governor Parking chain 2m,… Read More: Method Statement for Installation, Testing & Commissioning of Monospace Elevator »

Cold Storage Room Installation Method Statement

Cold room installation below explains precise steps for performing the installation activities in order to achieve best quality in compliance with project specifications and manufacturer instructions. Below is list of necessary tools and equipment for the installation of cold storage room on a project. Drill Machine Jig Saw Machine Hilti machine Tool Box Set Silicone… Read More: Cold Storage Room Installation Method Statement »

Woven Vinyl Flooring Installation Method Statement

Woven Vinyl Flooring installation works shall be completed as per details, pattern & design shown on the approved shop drawings and manufacturer’s recommendations. Visual appearance shall be consistence throughout and the vinyl flooring material shall be free from all defects like discoloration or other defects deleterious to strength, durability or appearance. Tools and Equipment Following… Read More: Woven Vinyl Flooring Installation Method Statement »

GRP Lining and Ladder Installation in Water Tank

Below is a precise method of statement covering the GRP lining and ladder installation in water tank. There shall be many other sections like scope of work, responsibilities references etc. but we have given below only the specific installation steps. Following tools shall be arranged before starting the GRP lining and ladder installation works. Mohair… Read More: GRP Lining and Ladder Installation in Water Tank »