Category Archives: Civil Method Statements

Method Statement For False Ceiling Works Gypsum Board, Beam Grid, Ceiling Tiles & Baffles

The following Method Statement describes the procedure and equipment required for the false ceiling works. Below civil method statement covers following types of false ceilings: Gypsum and Cement Board False Ceiling Beam Grid System False Ceiling Baffle ceiling Ceiling Tiles, 600 x 600mm and 600 x 1200mm Necessary Tools & Equipment Following tools shall be… Read More: Method Statement For False Ceiling Works Gypsum Board, Beam Grid,… »

Method Statement For Temporary Sheet Piling / Shoring

Before starting the works following equipment shall be arranged. QUY80A Hydraulic Crawler Crane 80t – Lattice boom crawler crane with retractable tracks, suitable for work on a leveled platform. ICE815C Vibratory Hammer with power pack- 1 Nos. Procedure for Temporary Sheet Piling / Shoring The vibratory hammer is a purpose-built hydraulically driven hammer complete with… Read More: Method Statement For Temporary Sheet Piling / Shoring »

Method Statement for Erection and Dismantling of Slab Formwork

General Requirements: Formwork shall be so constructed that it will support the loads imposed on it by fresh concrete together with additional stresses imposed by vibrating equipment and by construction traffic. For the construction of structural floor slabs formwork shall be used as per shop drawings and manufacturer’s recommendations. The PD 8 Shoring Tower &… Read More: Method Statement for Erection and Dismantling of Slab Formwork »

Method Statement For Installation Of Steel Structure For Attic Slab

Following equipment shall be arranged before starting the work. Lifting Equipment: Chain block / Lever Block is used to lifting the beams at the installation area. Usually use to help workers to lift the beams at low level height before fixing the connection bolts the same also for aligning the connection of the beams. Rotating & Power… Read More: Method Statement For Installation Of Steel Structure For Attic Slab »

Method Statement of Concreting for Vertical Elements Retaining Wall, Shear Walls & Columns

Below is a precise method statement for concrete works for vertical elements (Retaining Wall, Shear Walls, Columns etc.) Following equipment shall be arranged before starting the concrete pouring work: Survey Instruments Tower/Mobile Crane Mechanical Vibrators / Internal Vibrators Concrete Pumps Transit Mixer Trucks Batching Plant All necessary Hand Tools Safety Equipment’s Concreting Method For Vertical… Read More: Method Statement of Concreting for Vertical Elements Retaining Wall, Shear… »

Method Statement For Roof Waterproofing System

Following equipment and tools will be used as required during Roof Waterproofing System. Wire Brushes Soft Brushes Air Compressor Paint Brushes Paint rollers Scissors / Cutters Torch with Gas Cylinders etc. Wheel barrow Spatula Other Hand Tools etc. PROCEDURE FOR WATER PROOFING: STORAGE AND HANDLING OF MATERIALS: Materials shall be stored in a cool and… Read More: Method Statement For Roof Waterproofing System »