Tag Archives: Ceiling Tiles & Baffles

Method Statement For False Ceiling Works Gypsum Board, Beam Grid, Ceiling Tiles & Baffles

The following Method Statement describes the procedure and equipment required for the false ceiling works. The following types of False Ceilings will be covered. Gypsum and Cement Board False Ceiling Beam Grid System False Ceiling (CF-10) Baffle ceiling (CF-03 & CF-07) Ceiling Tiles, 600 x 600mm and 600 x 1200mm (C3, C3a, CF-02, CF-11, CF-12, CF-13)… Read More »