Gabion Wall Basket Geotextile Installation Method Statement

This procedure defines the requirements for gabion wall basket or mattress installation works, in order to maintain the soil stability for any kind of installations including landscaping and pipe works etc. Where multiple activities are scheduled, the general contractor is to review

2025
Aug
9

Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement

Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement

This method statement represents the proposed construction procedure for the bituminous roads, kerbs, tiles and paver block installation activities. It is the overall responsibility of the project manager for road work, to ensure that the site preparation activities and safety requirements are

2024
Sep
12

Road Marking Method Statement

Road Marking Method Statement

The purpose of this roadwork method statement is to ensure that all road marking and signs are executed safely and in accordance with the contract requirements and that all quality assurance and quality control activities are conducted in a systematic manner, also

2024
Mar
21

Road and Transport Works Terms & Definitions

Road Construction Terminology Glossary

Below are terms, words or expressions used in road works specifications tenders, communications and other project documents. These shall have the meanings hereby assigned to them. Aggregate: Hard mineral elements of construction material mixtures, for example: sand, gravel (crushed or uncrushed) or