Road and Transport Works Terms & Definitions

Below are terms, words or expressions used in road works specifications tenders, communications and other project documents. These shall have the meanings hereby assigned to them. Aggregate: Hard mineral elements of construction material mixtures, for example: sand, gravel (crushed or uncrushed) or crushed rock. Anchorage: Anchorage is the device comprising all the components and materials… Read More »

Method Statement For Roof Waterproofing System

Following equipment and tools will be used as required during Roof Waterproofing System. Wire Brushes Soft Brushes Air Compressor Paint Brushes Paint rollers Scissors / Cutters Torch with Gas Cylinders etc. Wheel barrow Spatula Other Hand Tools etc. PROCEDURE FOR WATER PROOFING: STORAGE AND HANDLING OF MATERIALS: Materials shall be stored in a cool and… Read More »

Superstructure Concrete Method Statement

Below is a precise method statement for superstructure concrete works which is applicable for any kind of the project. Setting out: Prior to the commencement of the works, confirm and establish all reference points and levels. Locate, confirm and protect control points prior to starting the site concrete works. Formwork Requirements Make sure that the formworks… Read More »

Dewatering System Installation & Operation Method Statement

Dewatering is defined as the removal of the ground water to a level below the normal water table, to enable excavation and construction to be carried out in suitable and safe working condition. It is proposed to install a single-stage well point system and sump pumps to control the ground water within each excavation area.… Read More »

Method Statement for Underground Cable Laying

This electrical safework method statement describes the management arrangements and system of work to adopted for the laying cable for the electrical project. Below is necessary tools & equipment for performing the site activities for laying the cable. Cable Rollers Cable Pulling Grip Hand Cable cutter Manual Cable Crimpers Hydraulic Pole Saws Hand shovel Pickaxe… Read More »

Method Statement for Air Conditioning Installation of DX Split Units Including Refrigerant Piping & Brazing

This air conditioning method statement is developed for any kind of the project in order to achieve best quality of work at all levels for ac installation activity. Method Statement covers all the critical installation activities of air conditioning systems that includes refrigerant piping installation, brazing and air conditioning unit installation. Purpose of this procedure… Read More »