2022
Apr
16
Specific Gravity and Water Absorption Aggregate Testing Method

The purpose of this procedure is to determine the specific gravity and water absorption of given sample of aggregates for road works. Specific gravity of an aggregate is considered to be a measure of strength or quality of the material. Stones having