Tag Archives: formwork requirements

Formworks and Accessories Requirements for Concrete Casting

Formwork and falsework shall be so constructed that they will support the loads imposed on them by the fresh concrete together with additional stresses imposed by vibrating equipment and by construction traffic, so that after the concrete has hardened the formed faces shall be in the positions shown on the drawings within the tolerances set… Read More: Formworks and Accessories Requirements for Concrete Casting »