2022
Aug
12

Chilled Water Pipe Installation & Testing Method of Statement

Below is a brief mechanical HVAC method statement that covers the installation of chilled water CHW piping system. This procedure defines the method used to ensure that the piping installation has been carried out as per contract requirements and best practices. Also

2017
Apr
19

Structural Steel Work, Roofing System, Wall Cladding & Steel Decking Design Requirements

Structural Steel Work Designs

This article covers the design of connections and the fabrication, supply and erection of structural steel work, roofing system, wall cladding and steel decking. Below is a list of applicable standards and codes: BS 7668:1994, BS EN 10113, BS EN 10155, BS EN