This air conditioning method statement is developed for any kind of the project in order to achieve best quality of work at all levels for ac installation activity. Method Statement covers all the critical installation activities of air conditioning systems that includes
Read More
	
					
	
							
			
		 
	
				
	This risk assessment is applicable for Chop Saws, Angle Grinders, Bench Grinders, cutting and grinding tasks in mechanical, fabrication and electrical disciplines. Hazards related to abrasive wheel include: Fire/explosion through ignition of sparks Bursting of abrasive wheel or disc at high speed Contact with wheel or
Read More
	
					
	
							
			
		 
	
				
	This electrical risk assessment covers all operations related to electrical LV, MV inspection and testing. Related hazards include: Electrocution Electric Burn Fire Explosion Control Measures  5 Golden Rules to avoid accidents due to electricity: 1. Disconnect completely ( the apparatus on which
Read More
	
					
	
							
			
		 
	
				
	This is basic risk assessment that is applicable for the use of hammer, screw drivers, knifes, hammers, snips, measuring tape etc. Hazards may include: Hand Injury Face/Eye Injury Foot Injury Injury to other parts of the body Control Measures Selecting the right tool
Read More
	
					
	
							
			
		 
	
				
	Below is work at height risk assessment that covers work in any place including at or below ground  level and/or obtaining access to a place of work where an employee could fall a distance liable to  cause injury. Scope of work may
Read More
	
					
	
							
			
		 
	
				
	This risk assessment is applicable for all persons involved in transporting or supporting of a load by 1 or more employees and includes lifting, putting down, pulling, pushing, carrying or moving a load, which, by reason of its  characteristics or of unfavorable
Read More