Below is work at height risk assessment that covers work in any place including at or below ground level and/or obtaining access to a place of work where an employee could fall a distance liable to cause injury. Scope of work may
Read More
This risk assessment is applicable for all persons involved in transporting or supporting of a load by 1 or more employees and includes lifting, putting down, pulling, pushing, carrying or moving a load, which, by reason of its characteristics or of unfavorable
Read More
Activity: Use of electrical equipment’s Hazards & Risks: Electrical Shock, Cables management issues, Personal Injury Control Measures: – Fire exit routes / Muster points shall be properly indicated by installation of signs. – Working areas shall be barricaded (only authorized personnel are
Read More
This health and safety instruction provides information on the noise hazards and control measures regarding noise in the workplace with the view to prevent industrial hearing loss. The safety procedure is applicable for all kind of projects. Additional control measures may be
Read More
Project safety training for all project personnel is completed on the projects in accordance with the requirements documented in this hse training procedure as identified below. The Management of Health and Safety at work places a duty on every company to: 1.
Read More