2025
Apr
15

Metallic Piping Fabrication and Installation Method Statement & Job Safety Analysis

Typical Piping Lifting Installation Plan

This method statement covers the sequence of activities for fabrication, erection and installation procedure for Metallic Piping. The method is useful for carbon steels, alloy steels, stainless steels and nickel alloys systems. Procedure will help to ensure the compliance of piping works

2025
Jan
17

Safe Work Method Statement & Risk Assessment for Excavation and Trenching

Safe Work Method Statement for Excavation and Trenching

This safe work method statement SWMS details how specific risks associated with excavation, trenching and the location of underground services are to be managed and controlled. It outlines the common risks and dangers associated with this work and how to best control

2024
Jan
8

Job Safety Analysis For Screeding Civil Works & Download Link

Job Safety Analysis For Screeding Civil Works

Activity: Use of electrical equipment’s Hazards & Risks: Electrical Shock, Cables management issues, Personal Injury Control Measures: – Fire exit routes / Muster points shall be properly indicated by installation of signs. – Working areas shall be barricaded (only authorized personnel are

2023
Jul
15

Construction Noise Control Measures, Plan and Procedure

Construction Noise Control Measures, Plan and Procedure

This health and safety instruction provides information on the noise hazards and control measures regarding noise in the workplace with the view to prevent industrial hearing loss. The safety procedure is applicable for all kind of projects. Additional control measures may be

error: Content is protected !!