2024
Feb
15

Project Close Out Report / Checklist – Template

Were the project objectives (expected outcomes) Accomplished? Explanation if required Were all Deliverable submitted and accepted? Explanation if required Did the Client/Engineer verify that all deliverable met the requirements? Explanation if required Have all subcontracts been closed? Explanation if required Have all final payments been made? (i.e., invoices

2022
Aug
3

Construction Methodology for Building Construction Project Civil Work

The purpose of this construction methodology is to specify the requirements of civil building construction activities including excavation, backfilling, and allied activities complying with the contract documents, project specifications as per the scope of work and approved drawings/documents. This method statement also

2021
Apr
9

General Contractor Building Construction Method for Civil Works

Design of Temporary Works on Construction Projects

This civil work method statement is prepared to ensure that construction of buildings for the project shall comply on plans specifications and all  relevant standard and code requirements in the execution of different work activities to be performed in the construction of

2020
Dec
31

Workplace House Keeping Method for Site Contamination Control

Workplace House Keeping Method for Site Contamination Control

The purpose of this procedure is to provide general guidelines for implementation of controls to reduce the risk of contaminating the workplace and the natural environment. This standards safety instruction applies to all project site workplaces for maintaining good house keeping. Building

2020
Sep
25

Project Management Procedure for Surveillance of Subcontractors’ Operations

In order to ensure quality in all aspects of the construction site, close watch of subcontractors’ operations is no doubt compulsory. Every contractor shall establish and document an appraisal system to verify their sub contractor’s implementation of and conformance to the project

2020
Aug
5

Construction Project Documentation Procedure

Contractor’s QC documentation must cover all aspects of quality control program activities, and includes Daily Inspection Reports and Daily Test Reports. After quality control plan QCP approval by the client, the contractor will document the QC activities pursuant to the QCP. Daily