The Contractor shall undertake and complete the Works in accordance with the requirements of the construction Contract and shall liaise and consult with the Project Manager and the Engineer in administrating, coordinating and managing the project in accordance with its own approved
Read More
Below is list of activities which are involved from beginning of a project i.e. from project tender stage up to handing over and final close out after the defect liability period. This can be helpful for new comers in construction industry to
Read More
1.0 Purpose This procedure provides the requirement for cost forecasting, revenue forecasting and risk & opportunities forecasting to facilitate the accurate forecasting of the final position of projects at completion. 2.0 Scope This procedure is applicable for any kind of the project.
Read More
This Method Statement describes the hse management arrangements and systems of work to be adopted by Company during civil engineering and Infrastructure groundwork operations. The document, with its appended risk assessment, will suffice for the majority of works undertaken by the company
Read More
1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0
Read More
Table of Contents 1.0 Introduction 2.0 Purpose and Scope 3.0 Document Control 4.0 Reference Documents 5.0 Definitions, Terms and Abbreviations 6.0 Responsibility 7.0 Materials and Equipment 8.0 Resources 9.0 Methodology / Procedure 10.0 Permit 11.0 Quality Control 12.0 Health, Safety and Environment
Read More