Category Archives: Risk Assessment

Safe Work Method Statement & Risk Assessment for Excavation and Trenching

This safe work method statement SWMS details how specific risks associated with excavation, trenching and the location of underground services are to be managed and controlled. It outlines the common risks and dangers associated with this work and how to best control them. The control measures listed in this SWMS must be implemented on site.… Read More: Safe Work Method Statement & Risk Assessment for Excavation and… »

Job Safety Analysis For Screeding Civil Works & Download Link

Activity: Use of electrical equipment’s Hazards & Risks: Electrical Shock, Cables management issues, Personal Injury Control Measures: – Fire exit routes / Muster points shall be properly indicated by installation of signs. – Working areas shall be barricaded (only authorized personnel are allowed to enter). -Electrical Hand tools will be inspected before start the job… Read More: Job Safety Analysis For Screeding Civil Works & Download Link »

Construction Noise Control Measures, Plan and Procedure

This health and safety instruction provides information on the noise hazards and control measures regarding noise in the workplace with the view to prevent industrial hearing loss. The safety procedure is applicable for all kind of projects. Additional control measures may be required depending on project and country local legal occupational health and safety requirements… Read More: Construction Noise Control Measures, Plan and Procedure »