PROJECT RESPONSIBILITIES FOR THE CLIENT & ENGINEER

CLIENT PROJECT RESPONSIBILITIES  The Clients’ duties and responsibilities include: Obtain and provide the Project Manager with all necessary information (including reports and other relevant documentation) in its possession which relates to the Project execution and control. Provide the Project Manager in timely manner with all other information which the Project Manager may reasonably request. Give… Read More »

Method Statement For Removal Of Concrete Brackets Earlier Provided For Struts

EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 :  2 Nos. Hydraulic Saw Head, HILTI DSTS 30 :  2 Nos. Hydraulic Hoses (set of 6 hoses) :  2 Nos. Remote Control :  2 Nos. Coring Machines HILTI DD250 :  2 Nos. Drilling Machines HILTI TE 2 :  2 Nos. Diamond Wire :  1… Read More »

Project Completion and Handover Procedure

The purpose of the procedure is to ensure that key issues during the Project Completion stage of the construction cycle are administered in accordance with the Main Contract, including: – Taking Over Certificates – Defects Liability – Final Payment Application/Certificates For the administration of Monthly Statements/Applications and Certificates refer to procedure for Contractor’s Monthly Statements.… Read More »

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT All required design works are to be carried out to internationally recognized standards, in compliance with local codes and regulations and to the owner hotel operator’s requirements incorporating the latest standards and technology applicable to this type of development. IT & AUDIO-VISUAL SCOPE OF WORK… Read More »

Metallic Piping Fabrication and Installation Method Statement & Job Safety Analysis

This method statement covers the sequence of activities for fabrication, erection and installation procedure for Metallic Piping. The method is useful for carbon steels, alloy steels, stainless steels and nickel alloys systems. Procedure will help to ensure the compliance of piping works with the contractual applications and HSE requirements. Following equipment’s and tools shall be… Read More »

PROJECT RESPONSIBILITIES OF THE INTERIOR DESIGNER AT DIFFERENT STAGES

PROJECT RESPONSIBILITIES OF THE INTERIOR DESIGNER AT DIFFERENT STAGES PHASE 1 – CONCEPT DESIGN: The I.D Consultant will initially: Analyze the concept space planning with the Engineers and review the architectural layout to enhance and optimize the interior planning, circulation and special relationship between the key facilities. Agree with the Clients Representative all preliminary information necessary… Read More »