Drainage Installation Method Statement for Drainage Piping System

Below method statement covers the above ground drainage installation activities. By following this procedure contractor shall ensure that the installation of drainage piping has been carried out as per project contract requirements, specifications and best practices. It gives details of how the

2022
Jun
9

Underground Drainage Piping Installation Method Statement

Connection of Drainage Pipe Line method statement

This Method Statement covers the installation of uPVC and HDPE pipes for use with the underground and substructure drainage piping systems. Procedure defines the method used to ensure the underground drainage pipework installation has been carried out as per technical specifications and